COD Maintenance Facility

Unlike most maintenance facilities, this particular facility included a high end architectural finish as well as an expansive clear span over the truck maintenance bays. There is a ribbon window feature at the top of the precast panels around the entire perimeter to allow for natural light throughout the facility. In addition to the main facility, a side building was provided for the storage of winter equipment and salt for the campus. The load bearing insulated panels included a random plank form liner, tinted concrete mix, and abrasive blast. This project was the winner of the 2015 PCI Design Award for Best Warehouse/Storage/Distribution Center. Project was designed by Legat Architects and erected for Pepper Construction.