315 S Hicks Rd.

Release Date

ATMI Precast is working with McShane Construction along with Conor Development to provide a 161k Last Mile building. This project is utilizing our 101/2" insulate wall panel with heights up to 45'. The precast concrete project consists of multiple drive in doors for van access on one long elevation and standard truck docks with truck restraints along the other long elevation. The office area consists of large storefront expanses and precast concrete columns and spandrels. Check out some new photos of this project. The project is expected to be completed by Fall of 2020. This project was designed by Ware Malcomb Architects.